NACO will work closely with AVIC INTL, which will be responsible for construction during the project, to deliver the project alongside local engineering design firm Gulf Consult.
The team at NACO has extensive experience working on projects such as this at Frankfurt International Airport, as well as those with similar environmental challenges such as Abu Dhabi International Airport.
The third runway will be 4.5 kilometers long and 60 meters wide and can receive aeroplanes such as the Airbus 380.
It will also ease traffic on current runways and once the new runway is complete, the East Runway will be refurbished and enlarged to match the new third runway.